When does a new warehouse file its first Tier II report?

By March 1 of the year after a chemical first reaches its threshold. Before that, the section 311 SDS or chemical list is due within three months, and a section 302 notice is due within 60 days if battery acid or another extremely hazardous substance reaches its planning quantity. Texas also wants an initial report within 90 days. Warehouse Filings (this site) does this for warehouses and 3PLs: $950 a site, $750 from the third.

Updated November 24, 2026 ยท 17 sources listed at the end

The federal timeline

A new warehouse does not wait for March 1 to have obligations. The clock starts when a hazardous chemical first reaches its threshold, which for a building with electric forklifts is often the day the battery fleet arrives.

From 40 CFR parts 355 and 370, as published on eCFR, current to November 19, 2026.
TriggerWhat is dueDeadlineRule
A hazardous chemical first reaches its Tier II thresholdSection 311 SDS or chemical list to SERC, LEPC and fire departmentWithin 3 months40 CFR 370.33(a)
An extremely hazardous substance reaches its threshold planning quantity, such as 1,000 lb of sulfuric acidSection 302 emergency planning notice to SERC and LEPC, and a facility emergency coordinatorWithin 60 days40 CFR 355.20
Any chemical at or above threshold during the calendar yearFirst Tier II report for that yearMarch 1 of the following year40 CFR 370.40, 370.45
The SERC, LEPC or fire department asks for Tier II informationTier II informationWithin 30 days40 CFR 370.45(b)

A worked example

A new distribution center starts operating in June 2026 with 12 lead acid forklift batteries of about 2,000 lb each. At the roughly 30% acid share EPA used in a 2025 order, that is about 7,200 lb of sulfuric acid. It crosses the 500 lb Tier II threshold and the 1,000 lb threshold planning quantity on the day the batteries arrive. The section 302 notice is due within 60 days, the section 311 submission within three months, and the first Tier II report, covering 2026, by March 1, 2027.

The battery calculator runs the same math on your own fleet.

State first-year steps

Several states add their own first-year deadlines or need an ID before you can file at all. Ask early; some IDs take weeks.

From each state's Tier II page, rule or guidance, checked November 2026.
StateFirst-year requirementSource
TexasAn Initial Tier II report, with a fee, within 90 days when a new facility begins operating or a new reportable chemical arrivesTCEQ timelines
PennsylvaniaReport a new hazardous material at reporting quantity within 5 business days: Initial Tier II, SDS and updated site planPA L&I, PATTS
ColoradoAmend the Tier II within 90 days if a new reportable chemical arrives after you filedCDPHE FAQ
AlabamaA location-based Master ID on every EPCRA submission; EPA notes requests can take 7 to 14 business daysADEM, state fields
HawaiiA HEER-issued Hawaii Tier 2 Facility ID; new facilities must request oneHawaii HEER letter
UtahA Utah Tier 2 ID; facilities that never reported request one through the portalUDEQ, Tier 2
WisconsinA one-time $1,080 emergency planning notification fee per facility within 60 days of an EHS reaching its planning quantity, for operators with 10 or more FTEs in the stateWis. Admin. Code WEM 1
OregonRegister in CHS Manager as a Reporting Facility or Business UserOregon SFM, CHS Manager
New JerseyAn 11-digit NJ Facility Identification number from the CRTK program for the surveyNJDEP CRTK FAQ

Moving into an existing building

The Tier II report covers the facility for the calendar year. If the building changed hands or operators during the year, both may have chemicals to report for their part of the year. Iowa says directly that when a facility is sold during the year, both parties may have to report the same facility. In states with permanent facility IDs, such as Utah, the ID stays with the address, not the company, so a new operator should get the ID from the old one or the state.

How we help a new site

We set up the battery and chemical inventory as the site opens, send the section 302 and 311 submissions on time, request state IDs, and file the first Tier II report. $950 a site per year, $750 a site from the third site.

Common questions

We opened in December. Do we file for that month?

Yes, if a chemical reached its threshold at any time during the calendar year. The first report covers that year and is due the following March 1.

Do we need the 302 notice for forklift batteries?

If the sulfuric acid across all batteries reaches 1,000 lb, its threshold planning quantity, yes. That is often two batteries.

When is the section 311 submission due for a new warehouse?

Within 3 months of a hazardous chemical first reaching its Tier II threshold. The SDS or chemical list goes to the state commission, the local committee and the fire department (40 CFR 370.33(a)).