Warehouse Filings

Tier II reporting in Utah

Utah facilities file Tier II as a Tier2 Submit file through the UDEQ portal by March 1 for the prior calendar year. There is no Utah state fee. You also send copies to the local emergency planning committee and the fire department. Forklift battery acid counts toward the 500 lb threshold. A warehouse reporting that acid and generator diesel pays $0 in state fees.

Updated November 24, 2026 · 6 sources listed at the end

Key facts
DueMarch 1, no extensions
Where you fileTier2 Submit file through the UDEQ portal
State feeNo state fee
Typical warehouse fee$0 (battery acid and diesel, filed on time)
LEPC and fire departmentSend copies

Where and how to file in Utah

Utah Department of Environmental Quality, Division of Environmental Response and Remediation (Tier 2 Coordinator), for the Utah SERC runs Tier II for the state. EPA Tier2 Submit (.t2s, latest version) uploaded through the UDEQ Tier 2 Submission Portal (tier2.deq.utah.gov), accessed with an activated UtahID account. The filing system is at tier2.deq.utah.gov.

EPA's state page, last updated May 28, 2026, gives these instructions for Utah:

The Utah Department of Environmental Quality (UDEQ) is tasked by state statute to manage Tier II data for the Utah State Emergency Response Commission (SERC). UDEQ requires that each facility use EPA's Tier 2 Submit software for the current reporting year. A new version of the EPA Tier2 Submit is created in November of each year. Facilities must use the latest software version each year to avoid errors in submissions. Download the latest version of Tier2 Submit. UDEQ will only accept Tier2 Submit (.t2s) electronic file submissions through the UDEQ Tier 2 Submission Portal. Access to the portal is obtained by following the instructions at the Utah Tier 2 Chemical Inventory Submission webpage. When using the Tier2 Submit application, UDEQ requires that each facility enter its unique Utah Tier 2 State ID. This 8-character ID will consist of six digits preceded by "UT." For example, "UT001234." The ID is permanently linked to the facility address/location and will not change once assigned. Facilities can look up their Tier 2 ID under the My Facilities page in the portal. A facility that has never reported for Tier 2 in the past can request a new ID through the New Facility Request option in the portal. Facilities that need to backfile Tier 2 reports for previous years will not be able to submit reports through the Tier 2 Submission Portal. The Tier 2 Submission Portal is only set to the current reporting year. The RMP Reporting Center is staffed on weekdays from 8:00 a.m. to 4:30 p.m. Eastern Time. When you are ready to backfile your report, please contact the Tier 2 Coordinator at [email protected]. Reporting facilities are reminded that Tier 2 reports must also be filed with the local Fire Department and Local Emergency Planning Committee (LEPC). Your LEPC contact information can be found on the Utah Regions - Find Your Emergency Manager website. You may also access this list of emergency managers from the Utah Division of Emergency Management website by selecting the link for your region in the "Find Your Emergency Manager" section. Currently, there are no state fees for Tier 2 filing.

Fees in Utah

No state fee. The source reads: "No, currently, there are no Tier 2 report filing fees for Utah." Fee source.

Late fee: not published on the pages we read.

Deadline

March 1 annually for the previous calendar year; no extensions. Under federal rules the report is due on or before March 1 each year for the previous calendar year, so the report covering 2026 is due by March 1, 2027.

Copies to the LEPC and fire department

Yes. The portal submission covers the SERC only; separate reports must go to the LEPC and fire department.

State-specific requirements

Fields and attachments the state asks for

  • Utah Tier 2 ID number (format UT######) required for each facility; tied to the address/lat-long and unchanged by ownership or name changes. Source: deq.utah.gov

Other things to know

  • Portal access: create a UtahID, then email the Tier 2 Coordinator to activate it. Source: deq.utah.gov
  • Backfiling prior years requires the matching Tier2 Submit version from EPA's RMP Reporting Center and contacting the Tier 2 Coordinator. Source: deq.utah.gov
  • Utah has no Tier 2 requirements beyond federal 40 CFR Part 370. Source: deq.utah.gov
  • Unlimited resubmissions; the most recent becomes the active report. Closures need a letter on company letterhead to the Tier 2 Coordinator. Source: deq.utah.gov

Also checked on November 24, 2026

  • The March 1 deadline is statutory, so neither EPA nor the state can grant an extension. Source: deq.utah.gov
  • Reports can be resubmitted as often as needed; the latest submission becomes the active report. Source: deq.utah.gov
  • The portal accepts only the current reporting year; back-filing earlier years goes through the Tier 2 Coordinator. Source: deq.utah.gov

How to file in Utah, step by step

The steps a first-time filer follows, from the state's own instructions as read on November 24, 2026:

  1. Create a UtahID at ID.utah.gov, then email the Tier 2 Coordinator ([email protected]) your full name and UtahID email to activate portal access. Source: deq.utah.gov
  2. Prepare the report in the latest EPA Tier2 Submit software; the portal accepts nothing else. Source: deq.utah.gov
  3. In the portal, link your facility's Utah Tier 2 ID (format UT######) under My Facilities, or use New Facility Request if it has none, and enter it in Tier2 Submit. Source: deq.utah.gov
  4. Upload the .t2s file by March 1, verify the required fields, submit, and click Send Me A Receipt. Source: deq.utah.gov
  5. Send separate reports to your LEPC and fire department; the portal filing covers only the SERC. Source: deq.utah.gov

What a typical warehouse pays in Utah

Illustrative: one general warehouse (NAICS 493110), 40 employees, filing on time for calendar year 2026, reporting two chemicals: sulfuric acid in lead acid forklift batteries (an extremely hazardous substance, 7,260 lb on site) and diesel in a generator tank (11,900 lb). Applying the state's published fee rule, that warehouse pays $0 to the state for the year.

How it adds up: $0 state fee; Tier2 Submit software and the UDEQ portal are free = $0. Route assumed: EPA Tier2 Submit (.t2s) file uploaded to the UDEQ Tier 2 Submission Portal (the only accepted route); E-Plan not used, so no E-Plan charge. Any LEPC or fire department fee is not included; none is published by UDEQ.

Local fees, if any, are not included. Compare every state on what Tier II costs per facility. Fee rule: deq.utah.gov

Does Utah use the federal thresholds?

Utah has no Tier 2 requirements beyond federal 40 CFR Part 370, so the federal thresholds apply (10,000 lb; EHS at 500 lb or the TPQ, whichever is lower). Source: deq.utah.gov

Federal thresholds under 40 CFR 370.10: 500 lb or the threshold planning quantity, whichever is lower, for extremely hazardous substances such as the sulfuric acid in forklift batteries, and 10,000 lb for other hazardous chemicals such as diesel and propane.

Who to contact in Utah

Utah Department of Environmental Quality, Division of Environmental Response and Remediation, Tier 2 Coordinator (for the Utah SERC), 195 North 1950 West, Salt Lake City, UT 84116: phone (801) 536-4100, email [email protected]. Source: deq.utah.gov

To find your local emergency planning committee, use the state's official LEPC list.

What warehouses in Utah usually report

Most warehouse Tier II reports start with the sulfuric acid in lead acid forklift batteries. Sulfuric acid is an extremely hazardous substance, so the acid in every battery on site, spares included, is added up and compared to 500 lb. EPA says the consumer product exemption does not apply to forklift batteries. After that come diesel in generator and fire pump tanks, propane cylinders, and anhydrous ammonia in cold storage. The battery calculator and the threshold checker run the numbers.

What we could not confirm

We could not confirm a late fee on an official Utah page. Where a field says not published, we say so rather than guess. We recheck these pages each January before filing season.

Other states: Texas · Vermont · all states

Common questions

Does Utah charge a Tier II fee?

There is no Utah state fee. Source: deq.utah.gov.

Where do I file Tier II in Utah?

EPA Tier2 Submit (.t2s, latest version) uploaded through the UDEQ Tier 2 Submission Portal (tier2.deq.utah.gov), accessed with an activated UtahID account.

Do I send copies to the LEPC and fire department in Utah?

Yes. The portal submission covers the SERC only; separate reports must go to the LEPC and fire department.

When is the Utah Tier II report due?

March 1 annually for the previous calendar year; no extensions. Under federal rules the report is due on or before March 1 each year for the previous calendar year, so the report covering 2026 is due by March 1, 2027.

How much does a typical warehouse pay for Tier II in Utah?

$0 in state fees for one warehouse reporting battery acid and generator diesel, filed on time: $0 state fee; Tier2 Submit software and the UDEQ portal are free = $0. Local fees are not included.

Does Utah have lower Tier II thresholds than the federal rule?

Utah has no Tier 2 requirements beyond federal 40 CFR Part 370, so the federal thresholds apply (10,000 lb; EHS at 500 lb or the TPQ, whichever is lower).

Who do I contact about Tier II in Utah?

Utah Department of Environmental Quality, Division of Environmental Response and Remediation, Tier 2 Coordinator (for the Utah SERC), 195 North 1950 West, Salt Lake City, UT 84116: phone (801) 536-4100, email [email protected].

We build the battery and chemical inventory, check every threshold and file in your state's system. $950 a site per year, $750 a site from the third site. State fees extra.

Get a quote