| Key facts | |
|---|---|
| Stages | Scope, inventory, your approval, filing |
| Tier II reports | Due March 1, covering the previous calendar year |
| Annual WAIRE Reports | Due January 31 |
| Who certifies | The owner or operator or its designated representative (40 CFR 370.42, Rule 2305 (e)(5)) |
| WAIRE records | Kept for seven years, collected at the time of the action |
Scope
Confirm which sites cross a Tier II threshold and which buildings fall under WAIRE, then send a fixed quote in writing.
A site list with addresses and square footage.
Inventory
Build the battery and chemical inventory for each site, or the truck trip count and points ledger for each warehouse, with a source for every figure.
Forklift and battery lists, safety data sheets, fuel records. For WAIRE, gate or yard logs and records of zero-emission equipment and solar.
Approval
Send you the draft report and the working file behind it. Nothing is filed until you approve it.
A review by the person who certifies the report for your company.
Filing
File in the state's system or in WAIRE POP, send copies to the LEPC and fire department where the state requires it, and hand you the filed copy and confirmation.
Payment of state or AQMD fees, which are billed to you.
What you get for each Tier II site
- A battery and chemical inventory, built from your equipment lists, safety data sheets and fuel records, with the largest amount on site on any one day.
- A threshold review for each chemical against 40 CFR 370.10 and any lower state threshold.
- The report, filed in the state's system: E-Plan, a Tier2 Submit file, CERS, STEERS, PATTS, Hazconnect or the state's own portal.
- Copies to the local emergency planning committee and fire department where the state requires them.
- The filed copy, the agency confirmation and the working file behind every number.
What you get for each WAIRE report year
- A truck trip count by class from gate, yard or carrier records, and the weighted trips and points owed under Rule 2305.
- Points earned from each action you can document: zero-emission trucks and yard trucks, chargers, solar and the rest of the WAIRE menu.
- The Annual WAIRE Report, prepared for your approval and filed in WAIRE POP.
- An evidence file. Rule 2305 requires records to be kept for seven years and collected at the time of the action.

The data we ask for
The data request is the same for every warehouse, and most of it is already somewhere in your files. Each item maps to a field on EPA's Tier II form or to a threshold test.
| What we ask for | Why the report needs it | Where it usually comes from |
|---|---|---|
| Forklift list with battery model, voltage and weight, plus spare batteries | Sulfuric acid in every battery is added up and compared with 500 lb | Fleet lease or service records, battery nameplates |
| Safety data sheet for each battery model | Gives the electrolyte share; without it the acid has to be estimated | Battery supplier or service company |
| Generator, fire pump and fuel tank capacities and fill records | Diesel is compared with 10,000 lb at the largest amount on any one day | Facilities team, fuel delivery tickets |
| Propane cylinder count and size, and any bulk tank | Propane is compared with 10,000 lb | Propane supplier invoices |
| Ammonia refrigeration charge, if any | Anhydrous ammonia is an extremely hazardous substance with a 500 lb threshold | Refrigeration contractor or PSM documents |
| SDSs for chemicals stored for clients (3PLs) | Chemicals at the facility count no matter who owns them | Client inbound documents, WMS item master |
| Facility address, latitude and longitude, NAICS code, maximum occupants | Required Tier II page 1 fields | Site manager, lease |
| Emergency contacts with 24-hour phone numbers | Required on every Tier II report | Site and regional managers |
| Site map with storage locations | Storage location descriptions, and a map where the state asks for one | Building plans, fire department preplan |
Download the blank checklist (CSV)
What the finished file looks like
| Deliverable | What it contains | When you get it |
|---|---|---|
| Threshold review | Each chemical on site, its largest amount on any one day, its threshold under 40 CFR 370.10 or the state's lower one, and a report or below result | During scoping, before any fee for that site |
| Battery and chemical inventory | Every battery by unit, weight and acid share, spares included; tanks and cylinders by capacity; the document behind each figure | With the draft |
| Draft Tier II report | The state's form or system entry, with the EPA range codes for maximum and average daily amounts, days on site, storage types and locations | For sign-off before filing |
| Filing confirmation | The agency's receipt or confirmation number and the filed copy | On filing |
| Copy log | Proof of the copies sent to the local emergency planning committee and fire department where the state requires them | On filing |
| Working file | The spreadsheet behind every number, kept so next year's report starts from it | On filing |
An example of the battery register and threshold review, for a fictional 3PL, is on the home page. In it, 12 lead acid batteries holding 7,260 lb of sulfuric acid sit 14.5 times over the 500 lb threshold, which on the Tier II form is maximum amount range code 05 (5,000 to 9,999 lb).
What stays with you
Portal accounts stay in your company's name, and we work in them with your authorization. The certification on each report is made by the owner or operator or its officially designated representative, as 40 CFR 370.42 and Rule 2305 (e)(5) require. In Arizona your own employee submits the report we prepare.
Timing
Tier II reports cover the previous calendar year and are due March 1. Annual WAIRE Reports are due January 31. We start collecting records in December and send drafts in time for your review before each deadline. Missed years can be filed at any time.
| When | Tier II | WAIRE |
|---|---|---|
| November | EPA puts out the new Tier2 Submit version around November; Texas lets you start drafts in STEERS from November 1, but not submit until January 1 | Compliance year ends December 31 |
| December | We send the data request for each site | We request gate logs, carrier records and evidence for points |
| January | Records come back; we build the inventory | January 31: Annual WAIRE Report due |
| February | Drafts go out for sign-off, our target the second week | Late reports can still be filed in WAIRE POP |
| March 1 | Tier II due in every state for the previous calendar year | |
| After March 1 | Some state fees fall due later (Ohio by March 31); new chemicals or sites trigger updates |
Who this is for, and who it is not
A good fit
- Warehouse, distribution center and cold storage operators with electric forklifts, generator or fire pump diesel, propane cylinders or ammonia refrigeration.
- 3PLs running buildings for several clients, where the question is whose chemicals go on whose report.
- Companies with sites in several states that want one inventory method and each state's own system handled.
- Operators in South Coast AQMD buildings of 100,000 sq ft or more that owe Annual WAIRE Reports, including missed years after a notice of violation.
Better served elsewhere
- Chemical manufacturers and plants reporting dozens of process chemicals, or sites that also need TRI Form R, air permits or Risk Management Plans: an engineering consultancy fits better.
- Companies that want software to run filings themselves across hundreds of sites.
- Anyone who needs legal advice or a negotiator for a penalty. We are not a law firm.
- Sites where no chemical reaches a threshold. If scoping shows that, we tell you and charge nothing for that site.
What we do not do
We are not a law firm and do not give legal advice. If a notice of violation turns into a penalty negotiation, that belongs with you or your counsel, and we hand over the filed reports and working papers. We do not sell equipment or solar.
Common questions
Is anything filed before we approve it?
No. We send the draft report and the working file behind it, and nothing is filed until the person who certifies the report for your company approves it.
Who certifies the report?
The owner or operator or its officially designated representative, as 40 CFR 370.42 and Rule 2305 (e)(5) require. In Arizona your own employee submits the report we prepare.
Whose name are the portal accounts in?
Your company's. We work in them with your authorization.
When do you start collecting records?
In December, so drafts reach you in time for review before the January 31 WAIRE deadline and the March 1 Tier II deadline. Missed years can be filed at any time.
Tier II from $750 a site. Annual WAIRE Reports at $2,500 per warehouse per report year. Agency fees are paid by you to the agency.
Get a quote