Warehouse Filings

When does a warehouse owe an EPCRA section 302 notice?

When any extremely hazardous substance on site reaches its threshold planning quantity: 1,000 lb for sulfuric acid, 500 lb for anhydrous ammonia. You notify the state emergency response commission and the local emergency planning committee within 60 days and name a facility emergency coordinator. It is separate from the yearly Tier II report.

Reviewed November 2026 ยท 10 sources listed at the end

The trigger

Under 40 CFR 355.10 and 355.12, a facility is subject to emergency planning when any extremely hazardous substance is present at or above its threshold planning quantity, or when the state commission or the Governor designates it. The quantities are in Appendices A and B of 40 CFR part 355, and they are added across the facility: pure product plus the amount in every mixture over 1% (40 CFR 355.13 and 355.14).

Source: 40 CFR part 355, Appendix A and 40 CFR 370.10. The battery example is arithmetic at the 30% share EPA used in the Allen Distribution order.
ChemicalThreshold planning quantityTier II thresholdWarehouse example
Sulfuric acid1,000 lb500 lbTwo 2,000 lb lead acid batteries at EPA's 30% (1,200 lb)
Anhydrous ammonia500 lb500 lbA cold storage refrigeration charge of 500 lb or more
Chlorine100 lb100 lbWater treatment systems

For sulfuric acid there is a gap between the two numbers. A site with 500 to 999 lb of acid files Tier II but owes no section 302 notice. At 1,000 lb it owes both. At EPA's 30% share, two 2,000 lb batteries are enough to be in the second group.

What you must send

Source: 40 CFR 355.20.
WhatTo whomWhen
Notice that the facility is subject to emergency planningState emergency response commission and local emergency planning committeeWithin 60 days of first becoming subject
Name of the facility emergency coordinatorLocal committee, or the state commission if there is noneWithin 60 days of first becoming subject
Changes relevant to emergency planningLocal committeeWithin 30 days of the change
Information the local committee needs for its planLocal committeePromptly, on request

EPA does not require a specific format. It recommends sending the notice in writing, and the state or local committee can ask for their own format (40 CFR 355.21). A short letter that names the facility, the chemical, the coordinator and a 24-hour phone number covers it.

How it connects to Tier II

The Tier II report asks whether the facility is subject to the section 302 emergency planning notice (40 CFR 370.42(k)), and asks for the name, title and 24-hour phone number of the facility emergency coordinator (370.42(o)). EPA encourages facilities that are not subject to give a coordinator anyway. Answering yes on the Tier II form without ever sending the 60-day notice leaves a gap that is easy to see.

Why it exists

Local emergency planning committees must write a community emergency response plan and review it at least once a year. EPA lists the plan's required elements, starting with identifying the facilities and transport routes of extremely hazardous substances and designating facility emergency coordinators. The section 302 notice is how the committee learns your site belongs on that list. See what an LEPC does.

Not the same as release reporting

Section 304 is a different duty: immediate notice of a release of an extremely hazardous substance or CERCLA hazardous substance above its reportable quantity. Sulfuric acid's reportable quantity in Appendix A is 1,000 lb and ammonia's is 100 lb. A section 302 notice does not cover a release, and a release report does not replace the section 302 notice.

Common questions

Is the section 302 notice filed every year?

No. It is a one-time notice within 60 days of first becoming subject, followed by updates within 30 days when something relevant to emergency planning changes.

Can the facility emergency coordinator be an outside firm?

The rule asks for a facility representative who will take part in local emergency planning. Most sites name an employee who knows the building.

We have had batteries over 1,000 lb for years and never sent it. What now?

Send the notice now and correct the section 302 flag on your next Tier II report. Check with your state on how it wants late notices handled.

We build the battery and chemical inventory, check every threshold and file in your state's system. $950 a site per year, $750 a site from the third site. State fees extra.

Get a quote