| Key facts | |
|---|---|
| Due | March 1, report and payment |
| Where you file | Tier2 Submit file by email |
| State fee | $25 per 3 chemicals, $250 cap |
| Typical warehouse fee | $25 (battery acid and diesel, filed on time) |
| LEPC and fire department | Covered by state filing |
Where and how to file in New Mexico
New Mexico Department of Homeland Security and Emergency Management (DHSEM), Hazardous Materials Program, for the State Emergency Response Commission runs Tier II for the state. EPA Tier2 Submit (.t2s) file emailed to [email protected] (cloud link or USB by mail for large files); no .zip, PDF or paper; E-Plan not required.
EPA's state page, last updated May 28, 2026, gives these instructions for New Mexico:
New Mexico requires facilities to use Tier2 Submit. Facilities may send their submission electronically via email. Alternate submission methods are available for larger submissions. For more information, please visit the New Mexico Tier 2 webpage. A new version of Tier2 Submit is created around November of each year. Download the latest version of Tier2 Submit.
Fees in New Mexico
$25 per 3 chemicals per facility ($25 for 1-3, $50 for 4-6 ... $250 for 28 or more); fees for all NM facilities are added and capped at $250 total ($250 maximum per owner/operator on the fee report). Check or money order only, no invoices; government agencies exempt. The source reads: "FEE SCHEDULE PER FACILITY (MAXIMUM PAYMENT OF $250) 1 to 3 chemicals per facility $25.00" Fee source.
Late filing: Fines up to $5,000 may apply if the correct payment is not received by March 1; a check that cannot be matched to the facility makes the submittal late.
Deadline
March 1 annually (report and payment); the submittal is complete only when both the .t2s file and correct payment are received. Under federal rules the report is due on or before March 1 each year for the previous calendar year, so the report covering 2026 is due by March 1, 2027.
Copies to the LEPC and fire department
No, by default. New Mexico uses single-point submission to DHSEM; LEPC and fire department copies are needed only if those agencies keep their own local requirements.
State-specific requirements
Fields and attachments the state asks for
- Annual Tier II Fee Report (Tier II Submission Form) must be returned with the payment. Source: dhsem.nm.gov
- Check must be matchable to the facility name on the Tier II report. Source: dhsem.nm.gov
Other things to know
- Only the current version of Tier2 Submit is accepted; .zip, .pdf and paper copies are refused. Source: dhsem.nm.gov
- E-Plan submissions or payments are not credited. Source: dhsem.nm.gov
- Overpayments are not refunded. Source: dhsem.nm.gov
- Government agencies, and contractors filing for them, are exempt from fees. Source: dhsem.nm.gov
Also checked on November 24, 2026
- New Mexico uses single-point submission: LEPC and fire department copies are needed only if those agencies keep their own local requirements. Source: dhsem.nm.gov
- A submittal is complete only when both the electronic file and the correct payment are received. Source: dhsem.nm.gov
How to file in New Mexico, step by step
The steps a first-time filer follows, from the state's own instructions as read on November 24, 2026:
- Build the report in the current EPA Tier2 Submit software and create a .t2s submission (no .zip, PDF or paper). Source: dhsem.nm.gov
- Email the .t2s file to [email protected] (cloud link or mailed USB if too large). Source: dhsem.nm.gov
- Complete the Annual Tier II Fee Report and mail it with a check or money order payable to NM Department of Homeland Security and Emergency Management by March 1, to PO Box 27111, Santa Fe, NM 87502. Source: dhsem.nm.gov
- Make sure the check can be matched to the facility name on the Tier II report, or the submittal counts as late. Source: dhsem.nm.gov
What a typical warehouse pays in New Mexico
Illustrative: one general warehouse (NAICS 493110), 40 employees, filing on time for calendar year 2026, reporting two chemicals: sulfuric acid in lead acid forklift batteries (an extremely hazardous substance, 7,260 lb on site) and diesel in a generator tank (11,900 lb). Applying the state's published fee rule, that warehouse pays $25 to the state for the year.
How it adds up: 2 chemicals falls in the 1 to 3 band = $25. Route assumed: EPA Tier2 Submit (.t2s) file emailed to [email protected] plus a mailed check or money order with the fee report; New Mexico does not require E-Plan and gives no credit for E-Plan payments, so no $25 E-Plan charge. None beyond the profile.
Local fees, if any, are not included. Compare every state on what Tier II costs per facility. Fee rule: dhsem.nm.gov
Penalties in New Mexico
Fines of up to $5,000 may apply if the correct payment is not received by March 1, and an unmatched check makes the submittal late. Source: dhsem.nm.gov
Federal penalties apply everywhere: up to $71,545 per section 312 violation, each day counted separately. See Tier II penalties for warehouse cases.
Who to contact in New Mexico
New Mexico Department of Homeland Security and Emergency Management (DHSEM), Hazardous Materials Program, Tier II Reporting: email [email protected]. Source: dhsem.nm.gov
To find your local emergency planning committee, use the state's official LEPC list.
What warehouses in New Mexico usually report
Most warehouse Tier II reports start with the sulfuric acid in lead acid forklift batteries. Sulfuric acid is an extremely hazardous substance, so the acid in every battery on site, spares included, is added up and compared to 500 lb. EPA says the consumer product exemption does not apply to forklift batteries. After that come diesel in generator and fire pump tanks, propane cylinders, and anhydrous ammonia in cold storage. The battery calculator and the threshold checker run the numbers.
Other states: New Jersey · New York · all states
Common questions
Does New Mexico charge a Tier II fee?
The state fee is $25 per 3 chemicals, $250 cap. Source: dhsem.nm.gov.
Where do I file Tier II in New Mexico?
EPA Tier2 Submit (.t2s) file emailed to [email protected] (cloud link or USB by mail for large files); no .zip, PDF or paper; E-Plan not required.
Do I send copies to the LEPC and fire department in New Mexico?
No, by default. New Mexico uses single-point submission to DHSEM; LEPC and fire department copies are needed only if those agencies keep their own local requirements.
When is the New Mexico Tier II report due?
March 1 annually (report and payment); the submittal is complete only when both the .t2s file and correct payment are received. Under federal rules the report is due on or before March 1 each year for the previous calendar year, so the report covering 2026 is due by March 1, 2027.
Is there a late fee for Tier II in New Mexico?
Fines up to $5,000 may apply if the correct payment is not received by March 1; a check that cannot be matched to the facility makes the submittal late.
How much does a typical warehouse pay for Tier II in New Mexico?
$25 in state fees for one warehouse reporting battery acid and generator diesel, filed on time: 2 chemicals falls in the 1 to 3 band = $25. Local fees are not included.
Who do I contact about Tier II in New Mexico?
New Mexico Department of Homeland Security and Emergency Management (DHSEM), Hazardous Materials Program, Tier II Reporting: email [email protected].
We build the battery and chemical inventory, check every threshold and file in your state's system. $950 a site per year, $750 a site from the third site. State fees extra.
Get a quote- New Mexico Department of Homeland Security and Emergency Management (DHSEM), Hazardous Materials Program, for the State Emergency Response Commission, Tier II page
- New Mexico: Annual Tier II Fee Report (Tier II Submission Form) must be returned w
- EPA, State Tier II Reporting Requirements and Procedures (updated May 28, 2026)
- 40 CFR 370.45, when inventory information is due (eCFR)
- 40 CFR 370.44, who receives the report (eCFR)
- EPA, Forklift batteries
- New Mexico LEPC list